Public Service Enterprise Group Incorporated

Public Service Enterprise Group Incorporated

PEG

$73.22

Updated: 05/11/2026, 00:07:42

Market Cap
$36.50B
Sector
Utilities
Industry
Regulated Electric
Country
US

No historical data available

Company Profile

Public Service Enterprise Group Incorporated (PSEG) is an energy provider primarily operating through its subsidiaries in the Northeastern and Mid-Atlantic United States. The company's business activities are structured into two primary segments: PSE&G and PSEG Power. The PSE&G division is responsible for transmitting electricity and distributing both electricity and natural gas to residential, commercial, and industrial customers. This segment also commits resources to solar power generation projects and various energy efficiency initiatives, as well as offering appliance service and repair. By December 31, 2021, its substantial infrastructure included 25,000 circuit miles of electric transmission and distribution systems, supported by 862,000 utility poles. It also featured 56 switching stations with a total capacity of 39,353 megavolt-amperes (MVA) and 235 substations with a combined capacity of 9,285 MVA. The electric network was further managed by four main and five sub-electric distribution headquarters. On the gas side, PSE&G maintained 18,000 miles of gas mains, twelve primary and two secondary gas distribution headquarters, a single meter shop, and 58 natural gas metering and regulating stations. Public Service Enterprise Group Incorporated was established in 1985 and is headquartered in Newark, New Jersey.

USD
NYSE
CEO: Ralph A. LaRossa
Employees: 13,189
https://investor.pseg.com
Asset Summaries
Latest generated summaries for PEG

No summaries found.

Detailed business
Evidence-backed facts extracted from the latest official annual filing.
PEG-10-k-fy2025.html14.3 MBtext/htmlENFiled 26/02/2026Period ended 31/12/2025

Business monitoring

Reported and calculated KPIs plus operational exposure disclosed in the FY 2025 filing.

Evidence-backed · 34 KPI observations

Revenue

N/A

FY — · Reported

Net income

2.1B

FY 2025 · Reported

Gross margin

N/A

FY — · Reported

Free cash flow

0.0B

FY 2025 · Calculated

R&D intensity

N/A

FY — · Reported

Share repurchases

N/A

FY — · Reported

Earnings and cash generation
USD billions, directly sourced from inline XBRL; free cash flow is operating cash flow less capex.
Profitability and reinvestment
Margins and R&D as a percentage of revenue.
Top products and services
Products and services mentioned in the filing; a quantitative sales breakdown was not disclosed.

Other offerings mentioned without separate sales

BGS default supply structure
Clean Energy Future programs

Area-level product sales are displayed only when the filing reports a product × geography breakdown. Regional totals are not allocated across products by estimation.

Geographic footprint
What the filing identifies, separated by location role so partner manufacturing is not presented as Apple-owned factories.
1 named headquarters
0 manufacturing countries
0 individually named factories

Map layer

Pins show disclosed operations. The heatmap colors the filing’s reported geographies; regional figures shade the region and are not estimates for each country.

No reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosure
Named headquarters Manufacturing partner country

Only locations and quantities explicitly supported by the filing are displayed. A country-level manufacturing percentage or product allocation is shown only when the source discloses it; materiality scores are never presented as production shares.

How the business makes money

PSEG holding company structure

Public utility holding company operating through PSE&G (regulated NJ electric/gas utility) and PSEG Power (nuclear generation), plus PSEG LI, Energy Holdings, and Services

99%
Source evidence
“We are a public utility holding company that, acting through our wholly owned subsidiaries, is a predominantly regulated electric and gas utility and a nuclear generation business.”

PSE&G utility description

PSE&G transmits and distributes electricity and natural gas in New Jersey; invests in regulated solar and EE programs; regulated by BPU, FERC and other federal/NJ regulators.

98%
Source evidence
“a public utility engaged principally in the transmission of electricity and distribution of electricity and natural gas in certain areas of New Jersey”

PSEG Power merchant nuclear

PSEG Power operates merchant nuclear generating assets and fuel supply functions with competitive energy sales; regulated by FERC, NRC and state regulators.

97%
Source evidence
“an energy supply company that consists of the operations of merchant nuclear generating assets and fuel supply functions engaged in competitive energy sales”

Market-based rate authority filings

PSEG Energy Resources & Trade, PSEG Nuclear and PSE&G hold MBR authority and file triennial market power analyses; update filed end of 2025

90%
Source evidence
“These companies, which include PSEG Energy Resources & Trade LLC, PSEG Nuclear LLC and PSE&G must file at FERC every three years to update their market power analyses.”

PJM RPM capacity market structure

PJM RPM forward capacity auction; constrained-area generators paid more; all units in a zone receive marginal-unit clearing price

90%
Source evidence
“PJM operates a capacity market called the Reliability Pricing Model (RPM), the rules for which are approved by FERC.”

Two reportable segments

PSEG's business consists of two reportable segments: PSE&G (regulated electric & gas utility in New Jersey) and PSEG Power & Other (merchant nuclear generation plus parent, PSEG LI, Energy Holdings, Services).

98%
Source evidence
“PSEG’s business consists of two reportable segments, PSE&G and PSEG Power LLC (PSEG Power) & Other”

PSE&G regulated utility

Franchised New Jersey public utility providing electric transmission and electric/gas distribution to residential, commercial and industrial customers

98%
Source evidence
“PSE&G earns revenues from its regulated rate tariffs under which it provides electric transmission and electric and natural gas distribution to residential, commercial and industrial (C&I) customers in its service territory.”

PSEG Power nuclear generation

PSEG Power earns revenues primarily by selling energy and capacity from nuclear units and wholesale natural gas through a full-requirements contract with PSE&G

97%
Source evidence
“PSEG Power earns revenues primarily by selling energy and capacity from its nuclear generation units and from the sale of wholesale natural gas through a full-requirements contract with PSE&G.”

PSEG LI LIPA contract extension

PSEG LI has operated LIPA's T&D system since 2014; the 12-year OSA expired Dec 31, 2025 and a five-year extension was approved; competitor's legal challenge dismissed but under appeal.

95%
Source evidence
“In 2025, a five year extension of the contract was approved. A competitor in the contract bidding process filed litigation against LIPA challenging the process.”

Large load / data center co-location customers as emerging demand and cost allocation issue

Data center co-located loads are subject of FERC proceedings on transmission services and charges paid by co-located load customers

85%
Source evidence
“there are ongoing proceedings at FERC that may impact the interconnection of large loads such as data centers to the power grid”

BGS default supply structure

Supplier of last resort via BGS-RSCP (3-year fixed-price auctions) and BGS-CIEP (hourly PJM prices, 12-month)

95%
Source evidence
“Approximately one-third of PSE&G’s total BGS-RSCP eligible load is auctioned each year for a three-year term.”

Clean Energy Future programs

CEF launched three of four components (EE, Energy Cloud completed 2024, EV); CEF-ES in abeyance

94%
Source evidence
“To date, we launched three of the four components of our CEF”

Margin structure: no commodity margin

Commodity portion managed by BGS/BGSS suppliers with pricing set by BPU as pass-through, resulting in no margin

95%
Source evidence
“The commodity portion of our utility business’ electric and gas sales is managed by basic generation service (BGS) and basic gas supply service (BGSS) suppliers. Pricing for those services is set by the BPU as a pass-through, resulting in no margin for our utility operations.”

Positioning and strategy

Approved investment clause programs

Major approved clause programs: CEF-EE II $2.9B, CEF-EE $1.6B, GSMP III $1.4B, GSMP II Ext $902M, IAP $511M, CEF-EV $166M

97%
Source evidence
“CEF-EE II $2.9 billion 2024 6 years 2025 ... GSMP III $1.4 billion 2025 3 years 2026”

GSMP III gas modernization program

BPU approved GSMP III in Nov 2025: $1.05B to replace 525 miles of cast iron/unprotected steel mains (2026-2028) plus $360M for an additional 75 miles.

97%
Source evidence
“the BPU issued an Order approving PSE&G’s GSMP III program, authorizing $1.05 billion of capital investment to replace 525 miles of high pressure cast iron gas mains”

CEF-EE II energy efficiency program

BPU approved ~$2.9B CEF-EE II EE program in Oct 2024 (~$1.9B net program budget, ~$1B on-bill repayment), for projects committed through June 30, 2027.

96%
Source evidence
“the BPU approved our CEF-EE II filing authorizing approximately $2.9 billion for energy efficiency projects committed between January 1, 2025 through June 30, 2027”

PJM competitively bid transmission project

PJM awarded ~$424M transmission project (Maryland/northern Virginia) in Dec 2023; PSEG does not believe a 2027 in-service date is reasonably achievable; outcome unpredictable.

95%
Source evidence
“PJM awarded us an approximately $424 million project to address increasing load and reliability issues in Maryland and northern Virginia”

PJM capacity market stress and reform

Dec 2025 PJM capacity auction cleared at cap $333.44/MW-day (uncapped $529.80); PJM fell 6,625 MW short; reform/backstop auction possible Sept 2026

95%
Source evidence
“the auction cleared at the FERC-approved price cap of $333.44/MW-day, and PJM indicated that without the price cap the clearing price would have been $529.80/MW-day”

PJM load forecast growth in PSEG zone

PJM's regional load forecast has increased significantly, reflecting large customer growth; PJM provided an annual update in January 2026 for the PSEG zone and across PJM

90%
Source evidence
“PJM's regional load forecast has increased significantly over the past few years, reflecting increased expectations of large customer growth and in January 2026, PJM provided an annual update of its load forecast in the PSEG zone and across PJM”

NJ service territory

PSE&G serves ~6.8M people (~74% of NJ population) across ~2,600 sq mi, including NJ's six largest cities

96%
Source evidence
“designated service territory running diagonally across New Jersey where approximately 6.8 million people, or about 74% of New Jersey’s population resides”

Nuclear license extensions and uprates

Revised nuclear useful lives expecting 20-year license extensions for Salem 1/2 and Hope Creek; Hope Creek refueling cycle extended to 24 months; planning Salem power uprates.

96%
Source evidence
“PSEG Power revised the estimated useful lives for the Salem 1, Salem 2 and Hope Creek nuclear plants due to our expectation that a 20-year license extension will be approved”

Second license renewal for Salem and Hope Creek

Potential second license renewal would extend Salem Units 1/2 to 2056/2060 and Hope Creek to 2066

95%
Source evidence
“This second license renewal would extend the operating licenses through 2056 and 2060 for Salem Units 1 and 2, respectively, and 2066 for Hope Creek.”

Risks, financing, and outlook

Nuclear production tax credit downside protection

Nuclear facilities retain downside price protection of a production tax credit (PTC) from 2024 through 2032; 2026 output expected to be realized above PTC threshold.

97%
Source evidence
“our nuclear facilities retain the downside price protection of a production tax credit (PTC) from 2024 through 2032”

Anticipated load growth driving investment

Significant load increase anticipated from EVs, data centers, and electrification, driving increased system investment

95%
Source evidence
“a significant increase in load is anticipated due to the increasing adoption of EVs, the expansion of data centers and other large users in our area, ongoing growth in the number of customers, other sources of electrification”

New Jersey Energy Master Plan updated November 2025

Updated NJ EMP (Nov 2025) includes 'No Regrets' recommendations; impact under new administration (Jan 2026) unpredictable

90%
Source evidence
“Given the new administration took office in January 2026, it is not clear how the EMP might influence New Jersey's energy policy and we cannot predict the impact on our business”

PJM capacity reform political pressure

Jan 2026 agreement by National Energy Dominance Council and all 13 PJM-state governors urges capacity market reform; backstop auction targeted Sept 2026

90%
Source evidence
“the White House's National Energy Dominance Council and governors from all 13 states in PJM signed an agreement urging PJM to expeditiously reform its capacity market”

PSE&G distribution rate case settlement (Oct 2024)

BPU-approved distribution rate case settlement: $17.8B rate base, 9.6% ROE, 55% equity component; storm cost and pension/OPEB recovery mechanisms from Jan 1, 2025.

98%
Source evidence
“The Order provided for a $17.8 billion rate base, a 9.6% return on equity for PSE&G’s distribution business and a 55% equity component of its capitalization structure”

NRC regulation and Peach Bottom license restoration

NRC oversight; Peach Bottom 2053/2054 license dates reinstated in 2025 after NEPA completion; potential compliance costs could be material

95%
Source evidence
“The NEPA analysis was completed in 2025 and the NRC reinstated the 2053 and 2054 license expiration dates for the Peach Bottom units.”

FERC reactive power compensation elimination

Reactive power compensation eliminated effective June 1, 2026; PSEG appeal pending; not expected to have material impact

95%
Source evidence
“in August 2025 accepted a PJM filing that establishes a June 1, 2026 date for elimination of reactive power compensation. In August 2025, PSEG sought judicial review of FERC's decision.”

FERC co-located load / data center interconnection proceedings

FERC proceedings on co-located load (data center) transmission charges and large-load interconnection queue rules due by end of April 2026

95%
Source evidence
“in October 2025, in response to a directive by the Secretary of Energy, FERC initiated a rulemaking proceeding to establish rules by the end of April 2026 to facilitate the interconnection of large load customers to the transmission system”

BPU regulation of New Jersey utility operations

BPU regulates PSE&G retail rates, securities issuance, adjustment clauses, and solar/EV/energy-efficiency programs

95%
Source evidence
“Our New Jersey utility operations are subject to comprehensive regulation by the BPU including, among other matters, regulation of retail electric and gas distribution rates and service”

NERC Reliability Standards compliance

PSEG must comply with NERC Reliability Standards covering grid operations and physical/cyber security; new standards expected

95%
Source evidence
“PSEG is required to comply with the North American Electric Reliability Corporation (NERC) Reliability Standards”

FERC RTO membership adder elimination risk: ~$40M annual impact

Elimination of the FERC RTO membership adder would reduce PSE&G's annual Net Income and annual cash inflows by approximately $40 million

95%
Source evidence
“PSE&G began receiving a 50 basis point adder for RTO membership in 2008. Elimination of the adder for RTO membership would reduce PSE&G's annual Net Income and annual cash inflows by approximately $40 million.”

PSE&G state regulation by BPU; base rates approved October 2024

PSE&G regulated by the BPU; base rates most recently approved October 2024; clause recovery mechanisms subject to prudency reviews

90%
Source evidence
“PSE&G's base rates were most recently approved in October 2024.”

CFTC Dodd-Frank swaps regulation

Subject to CFTC Dodd-Frank recordkeeping/data reporting as commercial end user; position limit compliance since 2022

90%
Source evidence
“We are currently subject to recordkeeping and data reporting requirements applicable to commercial end users.”

Regulatory approval and construction risk on T&D and nuclear capex program

Business plan calls for extensive T&D and nuclear investment; success depends on approvals, permits, land rights, budget completion, supplier performance and timely rate recovery

95%
Source evidence
“Our business plan calls for extensive investment in capital improvements and additions, including the construction of T&D facilities, modernizing and expanding existing infrastructure pursuant to investment programs that provide for current recovery in rates”

PJM resource adequacy challenges and affordability-driven regulatory uncertainty

PJM resource adequacy shortfall vs rising demand (data centers, EV adoption, electrification) has materially increased customer rates, prompting rate-mitigation proposals and regulatory uncertainty

95%
Source evidence
“PJM continues to face significant resource adequacy challenges, driven by a lack of sufficient supply to meet electric demand, which has increased significantly over the past several years and is expected to continue to increase going forward. Increasing demand is caused by data centers, EV adoption, electrification and other factors.”

Key forward-looking risk factors

Disclosed risks include resource adequacy, climate transition, cyber, supply chain/labor, nuclear fuel supply, AI, and regulatory recovery

92%
Source evidence
“significant resource adequacy challenges that present affordability and reliability concerns and that could cause policymakers to implement responsive measures”

Peach Bottom limited control risk

PSEG holds a 50% ownership interest in the Peach Bottom nuclear plants, which are operated by a third party, limiting control over associated risks

90%
Source evidence
“While we have a 50% ownership interest in the Peach Bottom nuclear generation plants, these plants are operated by a third party and, therefore, we have limited control over the risks associated with these plants.”

Nuclear forward sale and capacity performance obligation risk

PSEG Power's nuclear output is sold forward under fixed-price financial contracts; outages force buying replacement power or paying price differences, plus PJM capacity performance penalties that could be substantial

90%
Source evidence
“Because the obligations under most of these forward sale agreements are not contingent on a unit being available to generate power, PSEG Power's results of operations and cash flows are at risk even in the event of a plant outage”

Operational hazard risk: equipment failure, attacks, cyber, mutual aid

Exposure to equipment failure, gas explosions, war/terrorism, sabotage, cyberattacks and pandemics; storm restoration costs may not be fully recoverable

90%
Source evidence
“We are exposed to the risk of asset and equipment failures, gas explosions or leaks, accidents, pandemics, natural disasters, severe weather events, acts of war or terrorism or other acts of violence, including active shooter situations, sabotage, physical attacks or security breaches, cyberattacks or other incidents”

Climate change physical, financial and transition risks

Physical risks (severe weather, sea level rise, heat/drought) and transition risks (GHG policy, electrification, climate lawsuits) could impair operations, cost recovery and capital access

90%
Source evidence
“We are subject to physical, financial and transition risks related to climate change, including potentially increased legislative and regulatory burdens and changing customer preferences, and we may be subject to lawsuits”

Adjustment clause recovery delay risk

Delays in pass-through of costs or investment recovery under BPU adjustment clauses could significantly change PSE&G's cash flow

90%
Source evidence
“Delays in the pass-through of costs or recovery of investments under these mechanisms could result in significant changes in PSE&G's cash flow.”

Capital program disallowance risk; Clean Energy Future Energy Efficiency II ~$1B

Projects may be approved only in part or not at all, lowering rate base; CEF-EE II provides nearly $1 billion of funding including an on-bill repayment program subject to BPU prudency review

90%
Source evidence
“PSE&G's Clean Energy Future – Energy Efficiency II Program provides nearly $1 billion of funding to continue the on-bill repayment program”

Competition from FERC Order 1000 transmission development

FERC Order 1000 opened transmission development to competition from independent developers, which could decrease the value of new PSE&G transmission investments

85%
Source evidence
“FERC Order 1000 generally opened transmission development to competition from independent developers, allowing such developers to compete with incumbent utilities for the construction and operation of transmission facilities in its service territory.”

Third-party credit risk on nuclear output sales and bilateral hedges

PSEG is exposed to counterparty default risk in spot markets and bilateral contracts hedging nuclear generation output

85%
Source evidence
“We hedge generation output through the execution of bilateral contracts. These contracts are subject to credit risk, which relates to the ability of our counterparties to meet their contractual obligations to us.”

Affiliate scrutiny of PSE&G-PSEG Power full-requirements BGSS contract

PSE&G procures default BGSS gas supply through a full-requirements contract with affiliate PSEG Power, subjecting the affiliation to political and regulatory scrutiny

85%
Source evidence
“PSE&G procures the supply requirements of its default service BGSS gas customers through a full-requirements contract with PSEG Power.”

Distributed energy technologies may erode demand and strand assets

Distributed technologies could reduce demand for delivered energy, require distribution improvements, and render portions of T&D facilities obsolete

80%
Source evidence
“make portions of our transmission and/or distribution facilities obsolete prior to the end of their useful lives. These technologies could also result in further declines in commodity prices or demand for delivered energy.”

Material exposure graph

New Jersey Board of Public Utilities (BPU)
Regulatory Exposure

BPU regulates nearly every aspect of PSE&G's distribution business including retail rates; disallowances or partial approvals would lower rate base and earnings.

Relevance 95·Dependency 90·Confidence 95
Source evidence
“PSE&G is subject to regulation by the BPU. Such regulation affects almost every aspect of its businesses, including its retail rates.”
New Jersey BPU
Regulatory Exposure

BPU comprehensively regulates PSE&G's retail electric and gas rates, securities issuance, adjustment clauses, and solar/EV/EE programs; recovery delays could materially affect cash flow.

Relevance 95·Dependency 85·Confidence 95
Source evidence
“Delays in the pass-through of costs or recovery of investments under these mechanisms could result in significant changes in PSE&G's cash flow.”
New Jersey
Revenue Exposure

PSE&G's service territory, rate regulation, clean energy policy and nuclear fleet's carbon-free contribution (>80% of NJ carbon-free energy) concentrate exposure in New Jersey.

Relevance 92·Dependency 88·Confidence 98
Source evidence
“our nuclear units, which provide over 80% of the carbon-free energy in New Jersey”
New Jersey Board of Public Utilities (BPU)
Regulatory Exposure

BPU approves distribution rates, BGS auctions, and investment clause program cost recovery; October 2024 rate order set rate base, ROE and equity ratio.

Relevance 90·Dependency 85·Confidence 96
Source evidence
“Our distribution rates are subject to periodic rate cases approved by the BPU.”
New Jersey Board of Public Utilities
Regulatory Exposure

PSE&G's rates, EE programs (CEF-EE II) and gas modernization (GSMP III) all require BPU approval, directly driving revenue recovery and capex.

Relevance 90·Dependency 85·Confidence 97
Source evidence
“PSE&G is subject to regulation by the New Jersey Board of Public Utilities (BPU), the Federal Energy Regulatory Commission (FERC)”
Federal Energy Regulatory Commission (FERC)
Regulatory Exposure

FERC regulates wholesale transmission rates via formula rate; potential elimination of the RTO membership adder would cut annual Net Income and cash inflows by approximately $40 million.

Relevance 90·Dependency 80·Confidence 95
Source evidence
“Elimination of the adder for RTO membership would reduce PSE&G's annual Net Income and annual cash inflows by approximately $40 million.”
Nuclear Regulatory Commission
Regulatory Exposure

NRC holds ultimate authority over nuclear unit operation; compliance with new requirements, including possible modifications to Salem, Hope Creek and Peach Bottom, could carry material costs; Peach Bottom license dates reinstated in 2025.

Relevance 90·Dependency 80·Confidence 95
Source evidence
“We are unable to predict the final outcome of these reviews or the cost of any actions we would need to take to comply with any new regulations, including possible modifications to the Salem, Hope Creek and Peach Bottom facilities, but such costs could be material.”
Data centers
Demand Driver

Data center growth is a primary driver of PJM demand increases, raising energy and capacity prices and triggering affordability/regulatory responses that could impact PSEG's growth and cash flows.

Relevance 90·Dependency 70·Confidence 90
Source evidence
“Increasing demand is caused by data centers, EV adoption, electrification and other factors.”
Federal Energy Regulatory Commission (FERC)
Regulatory Exposure

FERC approves PSE&G's transmission tariffs and formula-rate ROE (9.90% base plus 50 bps RTO adder), and regulates Energy Holdings' competitively bid transmission.

Relevance 85·Dependency 75·Confidence 95
Source evidence
“Our revenues for these services are based upon tariffs approved by the Federal Energy Regulatory Commission (FERC).”
Federal Energy Regulatory Commission
Regulatory Exposure

Both PSE&G's transmission business and PSEG Power's merchant operations are FERC-regulated.

Relevance 85·Dependency 75·Confidence 96
Source evidence
“PSEG Power’s subsidiaries are subject to regulation by FERC, the Nuclear Regulatory Commission (NRC) and other federal regulators”
PJM capacity market prices
Revenue Exposure

PSEG generator revenues depend on PJM RPM capacity auction clearing prices, which reached the FERC-approved cap of $333.44/MW-day in Dec 2025; pending market reforms could alter cost allocation and price certainty.

Relevance 85·Dependency 70·Confidence 90
Source evidence
“clearing prices in the capacity auctions have reached unprecedented levels and there is growing concern that the capacity market is not procuring sufficient generation to meet increasing demand for electricity”
Electric demand growth / electrification
Demand Driver

Electrification, EV adoption and large customer growth are increasing load, requiring substantial generation, transmission and distribution investment and straining PJM resource adequacy.

Relevance 85·Dependency 65·Confidence 90
Source evidence
“Substantial investments in generation, transmission and distribution will be required to meet current projections of increasing customer demand.”
Extreme weather / climate hazards
Cost Driver

Severe weather events (e.g., Superstorm Sandy, Tropical Storms Isaias and Ida) damage facilities, raise maintenance and capital costs, and storm restoration costs may not be fully recoverable.

Relevance 85·Dependency 60·Confidence 90
Source evidence
“For our T&D business, the cost of storm restoration efforts may not be fully recoverable through the regulatory process.”
data centers
Demand Driver

Data center expansion in PSE&G's territory is cited as a key anticipated load growth driver requiring increased system investment.

Relevance 85·Dependency 60·Confidence 93
Source evidence
“the expansion of data centers and other large users in our area”
Data centers / large loads
Demand Driver

Large loads such as data centers drive electricity demand growth and are the focus of FERC proceedings on co-located load transmission charges and interconnection queue rules.

Relevance 85·Dependency 55·Confidence 85
Source evidence
“ongoing proceedings at FERC that may impact the interconnection of large loads such as data centers to the power grid”
EV adoption and electrification
Demand Driver

EV adoption and other electrification sources are expected to significantly increase load, driving system investment needs.

Relevance 82·Dependency 55·Confidence 92
Source evidence
“a significant increase in load is anticipated due to the increasing adoption of EVs”
PSEG Power LLC
Revenue Exposure

PSEG Power is a core subsidiary whose nuclear energy/capacity sales and wholesale gas contract with PSE&G drive consolidated profitability.

Relevance 80·Dependency 70·Confidence 94
Source evidence
“As a holding company, our profitability depends on our subsidiaries’ operating results.”
PJM energy and capacity markets
Revenue Exposure

Nuclear output is sold into PJM spot markets and hedged bilaterally; capacity performance rules impose penalties for underperformance during emergencies.

Relevance 80·Dependency 70·Confidence 90
Source evidence
“as capacity performance resources in PJM, PSEG's nuclear units have been and will in the future be required to pay penalties if a forced outage at a plant occurs during a declared emergency event within PJM”
FERC co-located load and large-load interconnection proceedings
Regulatory Exposure

FERC's Dec 2025 order finding the PJM tariff unjust and unreasonable and the large-load queue rulemaking (due end April 2026) could affect transmission charges and interconnection economics for co-located load customers.

Relevance 80·Dependency 55·Confidence 85
Source evidence
“directing PJM to file tariff revisions to reflect new types of transmission services that will be made available to co-located loads”
Commercial & Industrial customers
Customer Exposure

C&I customers represent the largest share of electric load (57%) and 38% of gas load in 2025.

Relevance 78·Dependency 65·Confidence 96
Source evidence
“Commercial 57 % 38 %”
Growing energy demand
Demand Driver

Growing demand is a stated driver of PSEG's capital investment program, including potential incremental investments at the upper end of the capex range.

Relevance 78·Dependency 50·Confidence 92
Source evidence
“The upper end of our capital investment range includes potential incremental investments to address continued demand growth”
PJM Interconnection
Demand Driver

PSE&G is a transmission owner in PJM, an ISO/RTO operating the Mid-Atlantic transmission system; RTO membership provides a 50 bps ROE adder.

Relevance 75·Dependency 70·Confidence 92
Source evidence
“We are a transmission owner in PJM Interconnection, L.L.C. (PJM) which is an Independent System Operator (ISO) and Regional Transmission Organization (RTO)”
NERC Reliability Standards
Regulatory Exposure

PSEG must comply with NERC standards governing grid planning/operation and physical and cyber security; new and modified standards are anticipated as threats grow.

Relevance 75·Dependency 65·Confidence 90
Source evidence
“Due to the increasing sophistication of physical and cyber security threats to the security and reliability of the electric grid, it is anticipated that FERC and NERC will continue to promulgate new Reliability Standards”
New Jersey Energy Master Plan
Regulatory Exposure

Updated EMP recommendations (clean energy deployment, energy efficiency, grid modernization, transportation electrification) could shape demand and investment, but impact under the new administration is unpredictable.

Relevance 75·Dependency 60·Confidence 85
Source evidence
“it is not clear how the EMP might influence New Jersey's energy policy and we cannot predict the impact on our business that might result”
Climate and GHG regulation
Currency Exposure

Climate-related state policy goals (GHG reductions, EE, solar, storage, EV/electrification) and regulatory responses may create material additional costs for customers and the business.

Relevance 75·Dependency 50·Confidence 85
Source evidence
“climate change-related state policy goals, including but not limited to those related to GHG emissions reductions, energy efficiency targets, solar targets, energy storage targets, encouragement of electrification through EV adoption”
nuclear fuel
Supplier Dependency

Ability to obtain adequate nuclear fuel supply and third-party credit risk on nuclear fuel purchases are disclosed risk factors for PSEG Power's generation business.

Relevance 72·Dependency 65·Confidence 90
Source evidence
“our ability to obtain adequate nuclear fuel supply”
New Jersey clean energy policy
Demand Driver

NJ Energy Master Plan and BPU EE framework drive EE program investments and GSMP methane reduction; net zero goal aligned to state climate goals.

Relevance 72·Dependency 55·Confidence 90
Source evidence
“our implementation of New Jersey's EE and related programs that are intended to support New Jersey’s Energy Master Plan (EMP)”
FERC reactive power compensation elimination
Regulatory Exposure

Elimination of reactive power compensation effective June 1, 2026 affects generator revenue, though PSEG states impact is not expected to be material; judicial appeal pending.

Relevance 70·Dependency 60·Confidence 90
Source evidence
“The loss of reactive power compensation is not expected to have a material impact on PSEG's results of operations.”
Supply chain / supplier performance risk
Competitive Exposure

Successful delivery of the capital program depends on contracting parties including suppliers performing timely and cost-effectively, plus labor availability.

Relevance 70·Dependency 55·Confidence 85
Source evidence
“ensure that contracting parties, including suppliers, perform under their contracts in a timely and cost-effective manner”
PJM Interconnection
Revenue Exposure

PJM capacity market design, generator interconnection policies and competitive transmission solicitations affect nuclear economics and transmission growth opportunities.

Relevance 70·Dependency 55·Confidence 90
Source evidence
“advocating for state and federal policies, such as the PTC established by the IRA, and capacity market reform and related generator interconnection policies at PJM Interconnection, L.L.C. (PJM)”
Full company information
Latest profile, trading, valuation, and identifier data stored for PEG.
Share price
$73.22
Market cap
$36.50B
Exchange
NYSE
Currency
USD
CEO
Ralph A. LaRossa
Employees
13,189
IPO date
02/01/1980
Beta
0.493
Last dividend
$0.00
Day range
$72.56 – $73.87
52-week range
$66.15 – $87.63
1-day performance
0.56%
1-year performance
10.69%
Current drawdown (1Y)
-16.44%
CIK
0000788784
CUSIP
744573106
ISIN
US7445731067
Created
07/12/2025, 05:42:40
Last update
05/11/2026, 00:07:42

Track Public Service Enterprise Group Incorporated with an AI analyst

See which prediction-market events move PEG, how its filings map to real-world exposure, and what 12 AI strategies are doing with positions like it.

Free forever to follow AlphaBrain’s AI strategies. No card required.