Entergy Corporation

Entergy Corporation

ETR

$108.92

Updated: 04/11/2026, 00:36:40

Market Cap
$52.04B
Sector
Utilities
Industry
Regulated Electric
Country
US

No historical data available

Company Profile

Entergy Corporation, headquartered in New Orleans, Louisiana, is a prominent American energy company primarily involved in generating and distributing electricity across the United States. Its operations are divided into two main divisions: Utility and Entergy Wholesale Commodities. The Utility division manages the end-to-end process of generating, transmitting, distributing, and selling electricity. This service covers specific regions of Arkansas, Louisiana, Mississippi, and Texas, including the metropolitan area of New Orleans, providing electricity to 3 million utility customers in these states. Additionally, this segment handles natural gas distribution. In contrast, the Entergy Wholesale Commodities division focuses on the ownership, operation, and decommissioning of nuclear power facilities. It also holds stakes in various non-nuclear power plants, selling their output to wholesale clients, and offers specialized services to other nuclear power plant operators. Entergy's electricity generation portfolio is diverse, utilizing natural gas, nuclear, coal, hydroelectric, and solar power. Collectively, its power plants boast an approximate generating capacity of 26,000 megawatts (MW), with 6,000 MW specifically from nuclear sources. Beyond its direct utility customers, Entergy also supplies energy to a range of wholesale clients, including other retail power providers, utility companies, electric power cooperatives, energy trading organizations, and fellow power generation firms. The company has a long history, established in 1913.

USD
NYSE
CEO: Drew Marsh
Employees: 12,233
https://www.entergy.com
Asset Summaries
Latest generated summaries for ETR

No summaries found.

Detailed business
Evidence-backed facts extracted from the latest official annual filing.
ETR-10-k-fy2025.html14.6 MBtext/htmlENFiled 19/02/2026Period ended 31/12/2025

Business monitoring

Reported and calculated KPIs plus operational exposure disclosed in the FY 2025 filing.

Evidence-backed · 36 KPI observations

Revenue

N/A

FY — · Reported

Net income

$1.8B

FY 2025 · Reported

Gross margin

N/A

FY — · Reported

Free cash flow

$-2.5B

FY 2025 · Calculated

R&D intensity

N/A

FY — · Reported

Share repurchases

N/A

FY — · Reported

Earnings and cash generation
USD billions, directly sourced from inline XBRL; free cash flow is operating cash flow less capex.
Profitability and reinvestment
Margins and R&D as a percentage of revenue.
Top products and services
Products and services mentioned in the filing; a quantitative sales breakdown was not disclosed.

Other offerings mentioned without separate sales

Utility segment retail electric subsidiaries and System Energy
Diverse generation portfolio including nuclear, hydro, solar, natural gas
Entergy Mississippi RenewABLE Community Option
Entergy Texas voluntary renewable tariffs

Area-level product sales are displayed only when the filing reports a product × geography breakdown. Regional totals are not allocated across products by estimation.

Geographic footprint
What the filing identifies, separated by location role so partner manufacturing is not presented as Apple-owned factories.
1 named headquarters
0 manufacturing countries
0 individually named factories

Map layer

Pins show disclosed operations. The heatmap colors the filing’s reported geographies; regional figures shade the region and are not estimates for each country.

No reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosureNo reported geographic revenue disclosure
Named headquarters Manufacturing partner country

Only locations and quantities explicitly supported by the filing are displayed. A country-level manufacturing percentage or product allocation is shown only when the source discloses it; materiality scores are never presented as production shares.

How the business makes money

Entergy business overview

Integrated energy company; ~25,000 MW capacity; ~3.1 million utility customers in AR, LA, MS, TX; $12.9B 2025 revenue; ~12,000 employees

99%
Source evidence
“Entergy owns and operates power plants with approximately 25,000 MW of electric generating capacity. Entergy delivers electricity to approximately 3.1 million Utility customers in Arkansas, Louisiana, Mississippi, and Texas. Entergy had annual revenues of $12.9 billion in 2025 and had approximately 12,000 employees as of December 31, 2025.”

Single reportable segment: Utility

Entergy operates primarily through a single reportable segment, Utility

99%
Source evidence
“Entergy operates primarily through a single reportable segment, Utility. The Utility segment includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans.”

Retail electric customers by operating company (thousands, %)

AR 738K (24%), LA 1,115K (36%), MS 459K (15%), New Orleans 209K (7%), TX 538K (18%); total 3,059K

99%
Source evidence
“Entergy ArkansasPortions of Arkansas738 24 Entergy LouisianaPortions of Louisiana1,115 36 Entergy MississippiPortions of Mississippi459 15 Entergy New OrleansCity of New Orleans 209 7 Entergy TexasPortions of Texas538 18 Total 3,059 100”

Electric service agreements with early termination payments

Early termination payment provisions in electric service agreements provide only partial protection

90%
Source evidence
“Our electric service agreements with these customers include provisions for early termination payments in certain circumstances, but they do not fully protect against these risks.”

Utility segment retail electric subsidiaries and System Energy

Five retail electric utilities (AR, LA, MS, New Orleans, TX) plus System Energy (90% of Grand Gulf, wholesale to affiliates)

98%
Source evidence
“The Utility segment includes five retail electric utility subsidiaries: Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas.”

Diverse generation portfolio including nuclear, hydro, solar, natural gas

Diverse power generation portfolio including nuclear, hydroelectric, solar, and highly efficient natural gas

97%
Source evidence
“The Utility has a diverse power generation portfolio including nuclear, hydroelectric, solar, and highly efficient natural gas.”

Entergy Mississippi RenewABLE Community Option

RenewABLE Community Option (Schedule RCO) lets qualifying non-residential customers subscribe to renewable resource capacity for ESG goals; registration launched May 2023

95%
Source evidence
“an offering for qualifying non-residential customers to subscribe to renewable resource capacity to satisfy their environmental, sustainability, and governance goals. Registration for the Schedule RCO launched in May 2023.”

Entergy Texas voluntary renewable tariffs

Voluntary renewable option tariffs Rider SVRO and Rider LVRO (approved August 2022) and asset-backed green tariff Schedule GFO (approved August 2023) let customers match usage with renewable energy credits or subscribe to solar capacity

95%
Source evidence
“Both tariffs are voluntary offerings that give customers the ability to match some or all of their monthly electricity usage with renewable energy credits that are purchased by Entergy Texas and retired on the customer's behalf.”

Positioning and strategy

Sale of natural gas distribution businesses

Entergy New Orleans and Entergy Louisiana natural gas distribution businesses sold on July 1, 2025

98%
Source evidence
“See "Dispositions - Natural Gas Distribution Businesses" in Note 14 to the financial statements for discussion of the sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses on July 1, 2025.”

Large-scale data center demand driving new generation and transmission investment

Data center load growth underpins new generation and transmission investments; concentration in a limited number of customers

97%
Source evidence
“The success of certain Utility operating companies' investments in new generation and transmission assets to support large-scale data centers depends on a limited number of such customers, the continued demand for electricity to power data centers and the successful completion of the associated generation and transmission projects.”

Load growth driven primarily by large-scale data centers

Capital plan heightened by number and size of projects to serve load growth driven primarily by large-scale data centers

95%
Source evidence
“The above risks are heightened by the number and size of the capital projects that Entergy and the Utility operating companies currently plan to undertake to serve load growth driven primarily by large-scale data centers.”

Strategy: grow utility business, invest in customer growth, reliability, and clean energy

Grow utility business with customer-driven capital investment in growth, reliability/resilience, and clean energy

97%
Source evidence
“Entergy invests significant capital to support customer growth as well as reliability and resilience. Entergy is also investing in clean energy to meet customer demands.”

Coal exit by end of 2030 exempts Entergy coal units from GHG rule

Due to Entergy's intention to cease burning coal by end of 2030, its coal-fired units are expected to be exempt from the May 2024 GHG emission guidelines for units operating beyond January 1, 2032

95%
Source evidence
“Due to Entergy's intention to cease burning coal by the end of 2030, Entergy's coal-fired generating units are expected to be exempt from this aspect of the final rule.”

Risks, financing, and outlook

Inflationary pressures on commodity prices and O&M

Inflationary pressures in commodity prices, materials, labor, health care, and pension costs may increase financing needs and affect cost recovery

90%
Source evidence
“Entergy and its subsidiaries have observed and expect continued inflationary pressures related to commodity prices, other materials and supplies, and operation and maintenance expenses, including in the areas of labor, health care, and pension costs.”

Fuel and purchased power cost recovery mechanisms

Fuel and purchased power costs are recovered through Entergy New Orleans's fuel adjustment tariff and Entergy Texas's fixed fuel factor (subject to PUCT fuel reconciliations and prudence findings)

90%
Source evidence
“Historically, semi-annual revisions of the fixed fuel factor have been made in March and September based on the market price of natural gas and changes in fuel mix.”

Utility debt to finance data center infrastructure

Significant level of debt expected to finance infrastructure investments for data center customers, with cost-recovery risk despite contractual protections

95%
Source evidence
“The Utility operating companies expect to incur a significant level of debt to finance the infrastructure investments associated with these customers' projects.”

Entergy New Orleans Renewable and Clean Portfolio Standard

RCPS requires 100% net zero carbon emissions by 2040 and no carbon-emitting resources by 2050, with a cost cap of 1% of plan year total utility retail sales revenues

95%
Source evidence
“a mandatory requirement that Entergy New Orleans achieve 100% net zero carbon emissions by 2040; ... a mechanism to limit costs in any one plan year to no more than one percent of plan year total utility retail sales”

Entergy Texas base rate case cadence and riders

Entergy Texas must file full base rate cases every four years (and within 18 months of using its generation cost recovery rider for investments above $200 million); TCRF, DCRF, and generation cost recovery riders available

95%
Source evidence
“Entergy Texas is required to file full base rate case proceedings every four years and within eighteen months of utilizing its generation cost recovery rider for investments above $200 million.”

Entergy Texas competitive generation tariff cap

Customer load under the competitive generation service program in Texas is limited to 115 MW

95%
Source evidence
“The amount of customer load that may be included in the competitive generation service program is limited to 115 MW.”

Entergy New Orleans formula rate plan extension

In October 2023 the City Council granted Entergy New Orleans a three-year extension of its electric and gas formula rate plans for filings in 2024, 2025, and 2026

95%
Source evidence
“In October 2023 the City Council granted Entergy New Orleans's request for an extension, subject to minor modifications.”

Environmental regulation compliance costs

Significant environmental compliance costs incurred and expected; potential enforcement, remediation, and third-party liability

90%
Source evidence
“have incurred and expect to incur significant costs related to environmental compliance”

Texas capacity cost recovery rider for MISO auction procurement

June 2025 Texas legislation established a capacity cost recovery rider allowing recovery of capacity procured via MISO's annual planning resource auction outside of base rates

90%
Source evidence
“the Texas legislature modified the Texas Utilities Code to establish a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO's annual planning resource auction outside of base rates”

Texas fuel reconciliation rulemaking

2023 Texas legislation requires fuel reconciliations at least once every two years; in December 2025 the PUCT adopted amendments with accelerated processing of fuel surcharges/refunds

90%
Source evidence
“In December 2025 the PUCT adopted amendments to its fuel rules that maintain a periodic revision to utility fuel factors coupled with accelerated processing of surcharges and refunds”

Regional haze second planning period (2018-2028) SIP proceedings

Regional haze SIPs: Louisiana's revised proposed SIP would not require additional pollution controls on Entergy's Louisiana units; ADEQ determined additional controls at Independence not cost-effective given commitment to cease coal by December 31, 2030; EPA proposed approval of Arkansas SIP September 2025

90%
Source evidence
“The revised proposed SIP would not require any additional pollution control installations on any Entergy-owned units in Louisiana.”

Entergy New Orleans storm securitization procedural timeline request

Entergy New Orleans requested a standard 120-day procedural timeline for securitization financing of storm restoration costs and greater escrow disbursement flexibility

90%
Source evidence
“allow for the issuance of a financing order no later than four months or 120 days from the date that Entergy New Orleans files any future applications seeking securitization financing of storm restoration costs”

Mississippi Distributed Generation Rule / solar for schools rulemaking

In June 2025 the MPSC initiated a rulemaking to amend the Distributed Generation Rule, including deleting the solar for schools program, and stayed the program pending outcome

90%
Source evidence
“The MPSC subsequently issued an order staying the program pending the outcome of the rulemaking docket.”

Utility regulatory recovery risk

Rate recovery subject to regulatory approval, disallowance risk, regulatory lag, and MISO-related cost allocation

96%
Source evidence
“The Utility operating companies recover fuel, purchased power, and associated costs through rate mechanisms that are subject to risks of delay or disallowance in regulatory proceedings.”

System Energy dependence on affiliate sales and Unit Power Sales Agreement litigation

System Energy dependent on affiliated sales for all revenues; Grand Gulf license expires November 2044; UPSA amended October 1, 2025 to remove Entergy Louisiana; FERC pension-cost litigation ongoing

95%
Source evidence
“System Energy's operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% ownership/leasehold interest in Grand Gulf.”

Nuclear operating, shutdown, and regulatory risks

Material nuclear risks for Entergy Arkansas, Entergy Louisiana, and System Energy including fuel supply, NRC regulation, decommissioning, and Price-Anderson/NEIL premiums

95%
Source evidence
“the potential requirement to pay substantial retrospective premiums and/or assessments imposed under the Price-Anderson Act and/or by Nuclear Electric Insurance Limited (NEIL) in the event of a nuclear incident”

Climate change physical and transition risks

Physical climate risks (hurricanes, drought, wildfires) and transition risks (GHG rules, renewable mandates, carbon pricing)

95%
Source evidence
“Entergy could be negatively affected by the effects of climate change, including physical risks, such as increased frequency and intensity of hurricanes, availability of water, droughts, and other severe weather and wildfires, and transition risks”

System Energy single-asset and affiliate dependence; holding company structure

System Energy dependent on affiliate sales for all revenues with litigation risk; holding company depends on subsidiary distributions

95%
Source evidence
“System Energy owns and, through an affiliate, operates a single nuclear generating facility, and it is dependent on sales to affiliated companies for all of its revenues. Certain contractual arrangements relating to System Energy, such affiliated companies, and these revenues are the subject of ongoing and potential future litigation and regulatory proceedings.”

Capital project completion risk for data-center-driven load growth

Completion of generation/transmission projects to serve large-scale data centers depends on financing, permits, MISO interconnection, labor, suppliers, and public support

95%
Source evidence
“The success of these Utility operating companies' investments in new generation and transmission assets to support large-scale data centers depends on the successful completion of large capital projects”

Holding company dependence on subsidiary distributions

Holding company depends on subsidiary distributions for debt service and dividends; structural subordination and preferred distribution priority at Entergy Utility Holding Company, LLC

95%
Source evidence
“Entergy Corporation is a holding company with no material revenue generating operations of its own or material assets other than the equity of its subsidiaries.”

Capital markets access, credit ratings, cybersecurity, workforce, and insurance risks

Capital market access/credit ratings, cyber/physical attacks, workforce, insurance, and commodity cost risks

94%
Source evidence
“Entergy and the Registrant Subsidiaries depend on access to the capital markets and, at times, may face potential liquidity constraints.”

Cybersecurity threats to energy infrastructure

Cyber attacks on energy infrastructure, including by foreign-government-associated actors and AI-fueled threats; insurance coverage may be inadequate

90%
Source evidence
“There have been attacks and threats of attacks on energy infrastructure by cyber actors, including those associated with foreign governments.”

Insurance market availability and cost

Insurance premiums expected to continue rising in near and medium term with more restrictive terms

90%
Source evidence
“Entergy expects the recent pattern of increasing premiums to continue in the near and medium term.”

Workforce attraction and retention risk

Failure to attract, retain and manage qualified workforce could negatively affect results; challenges particularly acute in rural areas near large-scale data centers

90%
Source evidence
“increased demand for skilled labor and challenging labor markets, particularly in rural areas where certain large-scale data centers and other large customers plan to be located”

Non-utility operations regulatory penalties

FERC penalties up to $1.544 million per day per violation of market-based rate rules for non-utility operations

90%
Source evidence
“the FERC can impose potential penalties of up to $1.544 million per day for each violation by any such entity of market-based rate rules and regulations”

EPA greenhouse gas rule for EGUs and proposed repeal

EPA's May 2024 GHG rules impose Phase 2 CCS-based CO2 standards on new base load gas turbines from January 1, 2032; numerous D.C. Circuit lawsuits were filed and in June 2025 the EPA proposed repealing the rule in its entirety or alternatively repealing the Phase 2 and existing-unit standards

90%
Source evidence
“In June 2025 the EPA released a rule proposing to repeal the May 2024 rule in its entirety, or alternatively, to repeal (1) the Phase 2 standard requiring carbon capture and sequestration for new combustion turbines”

Hazardous operations of power generation

Power generation involves hazardous activities with inherent fire, explosion, machinery failure, and natural hazard risks

85%
Source evidence
“Power generation involves hazardous activities, including acquiring, transporting and unloading fuel, operating large pieces of rotating equipment and delivering electricity to transmission and distribution systems.”

Material exposure graph

Large-scale data center customers
Customer Exposure

Data center customers expected to represent high percentage of sales, revenues, and cash flow for associated Utility operating companies; debt incurred to serve them creates cost-recovery risk

Relevance 95·Dependency 70·Confidence 95
Source evidence
“Entergy expects that these customers will represent a high percentage of total sales, revenues, and cash flow for the associated Utility operating company”
Data centers
Demand Driver

Load growth driven primarily by large-scale data centers is driving number and size of capital projects

Relevance 95·Dependency 60·Confidence 95
Source evidence
“capital projects that Entergy and the Utility operating companies currently plan to undertake to serve load growth driven primarily by large-scale data centers”
Large-scale data centers
Customer Exposure

New generation and transmission investments to serve large-scale data centers drive growth prospects, but depend on a limited number of such customers and continued data center electricity demand.

Relevance 90·Dependency 55·Confidence 95
Source evidence
“Any reduction in the demand for electricity to power data centers or delays or unexpected costs associated with such projects may harm the growth prospects, future operating results and financial condition of Entergy and these Utility operating companies.”
EPA Section 111 greenhouse gas rules
Regulatory Exposure

EPA GHG rules for new and existing EGUs could impose compliance costs or CCS requirements on Entergy's gas and coal fleet, though June 2025 proposed repeal reduces near-term risk

Relevance 85·Dependency 70·Confidence 90
Source evidence
“Numerous lawsuits were filed in the D.C. Circuit challenging the final rule, and oral argument was held in December 2024.”
MISO RTO tariff and markets
Regulatory Exposure

Utility operating companies' participation in MISO wholesale markets and transmission planning creates economic risk from market design changes, congestion, and transmission upgrade cost allocation.

Relevance 80·Dependency 70·Confidence 95
Source evidence
“The Utility operating companies are subject to economic risks associated with participation in the MISO markets and the allocation of transmission upgrade costs.”
natural gas
Cost Driver

Entergy Texas's fixed fuel factor revisions are based on the market price of natural gas and fuel mix, linking customer rates and recovery to gas prices

Relevance 80·Dependency 65·Confidence 90
Source evidence
“semi-annual revisions of the fixed fuel factor have been made in March and September based on the market price of natural gas and changes in fuel mix.”
Entergy Arkansas, Entergy Mississippi, Entergy New Orleans (affiliate off-takers)
Revenue Exposure

System Energy sells all Grand Gulf output at wholesale to affiliates; all revenues are from affiliated companies, a subject of litigation and regulatory proceedings.

Relevance 75·Dependency 100·Confidence 95
Source evidence
“System Energy sells its power and capacity from Grand Gulf at wholesale to Entergy Arkansas, Entergy Mississippi, and Entergy New Orleans.”
NRC nuclear regulation
Regulatory Exposure

NRC could change regulations, suspend or revoke licenses, or increase oversight of nuclear plants, materially affecting Entergy Arkansas, Entergy Louisiana, and System Energy.

Relevance 75·Dependency 60·Confidence 93
Source evidence
“the risk that the NRC will change or modify its regulations, suspend or revoke their licenses, or increase oversight of their nuclear plants”
Renewable and Clean Portfolio Standard
Regulatory Exposure

Entergy New Orleans must meet net zero by 2040 with a 1%-of-revenue annual cost cap and potential alternative compliance payments into a City Council clean energy fund

Relevance 75·Dependency 60·Confidence 90
Source evidence
“Entergy New Orleans will pay this if it is unable to comply with the Renewable and Clean Portfolio Standard. Such compliance payments are to be paid into a clean energy fund established by the City Council.”
Inflation
Cost Driver

Inflation in commodity prices, materials, labor, health care, and pension costs raises costs and financing needs and complicates cost recovery and affordability

Relevance 75·Dependency 50·Confidence 90
Source evidence
“Entergy and its subsidiaries have observed and expect continued inflationary pressures related to commodity prices, other materials and supplies, and operation and maintenance expenses”
New Orleans formula rate plans
Regulatory Exposure

Entergy New Orleans's electric and gas revenue recovery depends on City Council-approved formula rate plans extended through 2026 filings

Relevance 70·Dependency 65·Confidence 90
Source evidence
“a three-year extension of Entergy New Orleans's electric and gas formula rate plans, for filings in 2024, 2025, and 2026”
MISO interconnection queue and tariff rules
Regulatory Exposure

Projects depend on MISO interconnection queue positions and are subject to MISO tariff rules and process changes

Relevance 70·Dependency 60·Confidence 85
Source evidence
“obtain and maintain MISO interconnection queue positions and otherwise obtain necessary interconnection or transmission service in MISO”
Cybersecurity threats
Revenue Exposure

Cyber attacks including by foreign-government-associated actors could compromise operations and data, with insurance possibly inadequate

Relevance 70·Dependency 50·Confidence 90
Source evidence
“There have been attacks and threats of attacks on energy infrastructure by cyber actors, including those associated with foreign governments.”
Rising cost environment / inflation and tariffs
Cost Driver

Rising costs from inflation, increased tariffs, and policy changes could drive more frequent rate cases, cost recovery resistance, higher financing needs, and customer arrearages/bad debt.

Relevance 70·Dependency 50·Confidence 90
Source evidence
“The Utility operating companies also may experience, and in some instances have experienced, an increase in customer bill arrearages and bad debt expenses due to, among other reasons, increases in fuel and purchased power costs, especially in a rising cost environment, whether due to inflation or increased tariffs”
Uranium fuel (and conversion, enrichment, fabrication)
Raw Material Dependency

Nuclear plant operations depend on uranium fuel purchase and its conversion, enrichment, and fabrication, identified as a material risk.

Relevance 65·Dependency 55·Confidence 92
Source evidence
“risks related to the purchase of uranium fuel (and its conversion, enrichment, and fabrication)”
Regional haze program SIPs
Regulatory Exposure

State regional haze SIPs for Arkansas and Louisiana could require NOx/SO2 controls at Independence, Nelson 6, NISCO, and Ninemile, though current proposals require no additional controls

Relevance 65·Dependency 50·Confidence 85
Source evidence
“Entergy received information collection requests from the Arkansas and Louisiana Departments of Environmental Quality requesting an evaluation of technical and economic feasibility of various NOx and SO2 control technologies for Independence, Nelson 6, NISCO, and Ninemile.”
Solar panels
Technology Dependency

Capital project completion depends on solar panel siting and is exposed to trade/tariff actions on imported solar panels

Relevance 60·Dependency 50·Confidence 80
Source evidence
“including those associated with imported solar panels; as well as supply chain delays or disruptions”
Federal Energy Regulatory Commission
Legal Exposure

System Energy UPSA rates subject to FERC litigation over prepaid/accrued pension costs; FERC can penalize non-utility market rule violations up to $1.544 million per day

Relevance 60·Dependency 50·Confidence 90
Source evidence
“currently the subject of a litigation proceeding at the FERC with respect to System Energy's inclusion of pre-paid and accrued pension costs in rates”
Texas capacity cost recovery rider
Demand Driver

New 2025 Texas rider allows recovery of MISO annual planning resource auction capacity costs outside base rates, reducing recovery risk for capacity procurement

Relevance 60·Dependency 40·Confidence 85
Source evidence
“would allow for the recovery of costs related to the procurement of capacity through MISO's annual planning resource auction outside of base rates through a rider that is updated annually”
Entergy Utility operating companies
Customer Exposure

System Energy depends on affiliated Utility operating companies under the Unit Power Sales Agreement for all of its revenues

Relevance 55·Dependency 100·Confidence 95
Source evidence
“it is dependent on sales to affiliated companies for all of its revenues”
carbon capture and sequestration
Technology Dependency

If the EPA Phase 2 standard stands, new base load gas turbines would depend on CCS technology from January 1, 2032; EPA has proposed repeal on grounds it is not adequately demonstrated

Relevance 55·Dependency 40·Confidence 85
Source evidence
“to repeal (1) the Phase 2 standard requiring carbon capture and sequestration for new combustion turbines because it is not an adequately demonstrated technology”
Qualifying non-residential customers
Revenue Exposure

Renewable subscription offerings (Schedule RCO, Rider SVRO/LVRO, Schedule GFO) target non-residential customers' ESG-driven demand for renewable capacity and energy credits

Relevance 50·Dependency 30·Confidence 85
Source evidence
“an offering for qualifying non-residential customers to subscribe to renewable resource capacity to satisfy their environmental, sustainability, and governance goals”
Full company information
Latest profile, trading, valuation, and identifier data stored for ETR.
Share price
$108.92
Market cap
$52.04B
Exchange
NYSE
Currency
USD
CEO
Drew Marsh
Employees
12,233
IPO date
01/06/1972
Beta
0.433
Last dividend
$0.00
Day range
$107.61 – $110.10
52-week range
$90.87 – $118.45
1-day performance
-0.86%
1-year performance
19.86%
Current drawdown (1Y)
-8.05%
CIK
0000065984
CUSIP
29364G103
ISIN
US29364G1031
Created
07/12/2025, 03:51:13
Last update
04/11/2026, 00:36:40

Track Entergy Corporation with an AI analyst

See which prediction-market events move ETR, how its filings map to real-world exposure, and what 12 AI strategies are doing with positions like it.

Free forever to follow AlphaBrain’s AI strategies. No card required.

Latest Database News
News linked to ETR from your Railway `news_articles` table.

Entergy: Industrial Load Growth Can Drive A Major EPS Reset

Seeking Alpha • STOCK • 11/06/2026, 06:49:19

Entergy Corporation (NYSE: ETR) Stock Analysis: Price Target Adjustment Amid Rising Energy Demand

Market Data • Market Data • 10/06/2026, 20:12:47

Entergy Corporation (ETR) Analyst/Investor Day Transcript

Seeking Alpha • STOCK • 10/06/2026, 07:04:46

Entergy CEO: We produce steady predictable returns, but they have been a lot higher than in the past

CNBC Television • STOCK • 09/06/2026, 22:03:46

Entergy CEO pushes back on fears that AI data centers will drive up electricity bills

CNBC • STOCK • 09/06/2026, 20:49:27

Entergy Strengthens Growth Through Nuclear and Grid Investments

Zacks Investment Research • STOCK • 14/05/2026, 11:55:44

Entergy Shareholders Back Board as CEO Highlights Data Center Demand, Grid Investments

MarketBeat • STOCK • 12/05/2026, 03:07:01

Entergy Corporation announces pricing of common stock offering with a forward component

PRNewsWire • STOCK • 06/05/2026, 01:13:00

Entergy (NYSE: ETR) Price Target Raised Following Strong Q1 Revenue Growth

Market Data • Market Data • 30/04/2026, 17:25:06

Entergy Corporation (NYSE: ETR) Reports Strong Q1 Earnings Amidst Rising Power Demand

Market Data • Market Data • 29/04/2026, 19:06:43

Entergy Corporation (ETR) Q1 2026 Earnings Call Transcript

Seeking Alpha • STOCK • 29/04/2026, 17:11:40

Industrial Demand Surge & Retail Sales Growth Drive ETR's Q1 Earnings

Zacks Investment Research • STOCK • 29/04/2026, 15:01:34